Project  Thai Binh 1 Thermal Power Plant
1 Contractor Marubeni/ TOA Cop.(2011-2012)
2 Work done Soil improvement by Vacumm preloading & PVD

Pre-fabricate Vertical Drain PVD installation.

3 Quantity PVD 11.447.652m; Vacumm Preloading: 41.500m2.
4 Time  22/1/2014 to 7/2014
5 Location Thai Thuy, Thai Binh

Source: http://english.vov.vn/economy/construction-starts-on-thai-binh-thermal-power-plant-273525.vov

The plant is being built in My Loc commune, Thai Thuy district, by the Electricity of Vietnam Group (EVN) and Japanese contractor Marubeni at an estimated cost of VND26.5 trillion (US$1.27 billion).

construction starts on thai binh thermal power plant hinh 0
Deputy PM Hoang Trung Hai at the ground-breaking ceremony

About 85% of the total comes from the Japan International Cooperation Agency (JICA)’s ODA loan and the remaining 15% is sourced from the EVN.

The first turbine is scheduled to generate power in the fourth quarter of 2017,and the second in the second quarter of 2018. The two turbine groups will have a combined design capacity of 600MW and generate 3.6 billion kWhs annually.

Addressing the ceremony, Deputy PM Hai noted the project helps ensure an adequate supply of electricity not only for the northern region but also southern localities, especially during the dry season.

He asked local authorities and relevant agencies to speed up the project and protect the interests of displaced residents.

uld they take care of environmental protection; occupational safety, resolving issues arising … ensure that projects are implemented and completed according to quality requirements and schedule already set.