Bored Pile – Kalong Temporary Floating Bridge

Quoc Gia Construction excution bored pile in Kalong River for abbutment & retanning wall of  Kalong Floating bridge km 3+4, Móng Cái city, Quảng Ninh Province. The pile was excavated by DTH hammer to cut the hard layer of wearther rock.

Project Kalong Floating Bridge – km 3+4 
1 Client  Thành Đạt Company
2 Work done Bored Pile – D800.
3 Quantity 61 piles
4 Time fr Apr.2016
5 Location Kalong River, Móng Cái city, Quảng Ninh Pro.

Construct the temporary bridge Km3+4 via Ka Long River

Source: http://quangninhnews.vn/politics-society/201701/construct-the-temporary-bridge-km34-via-ka-long-river-2536015/
Monday, Jan 23 2017, 12:28.

QTV – On Jan 19th, Mong Cai City held a ground breaking ceremony to construct a temporary floating bridge at Km3+4 via boder river of Ka Long, connecting Mong Cai, Quang Ninh with Dongxing, China.

The ground breaking ceremony
The ground breaking ceremony

 

The construction site
The construction site

The bridge is 11m long, 12m wide with the capacity of 60 tons and the total investment of 160 bill VND. The opening of the bridge will faciliate the traffic circulation, increase  the competitiveness of the Mong Cai International border gate and the Dongxing China among other border gates and boost the socio-economic growth of the two localities.